Sewer Pump Replacement Update

Following the sewer pump failures in September, the Board and Management are working to get the sewer lift station pumps replaced as quickly as possible. Replacement bids are being received, and the Board is actively working to obtain bids from several vendors so that the job can be awarded and the new pumps installed.

The Board wants to be sure the right pumps are installed and that the bids are comparable. On Monday, November 16, the Board and Management will meet with representatives from SOCWA, along with a technician from Jimni Systems, who maintained the pumps for many years and is the most knowledgeable about them. The goal is to evaluate the system and determine the correct pumps to install, so that the Association has the best pumps for the job and the bids can be fairly compared.